Engineering Construction Activity, Australia

This is not the latest release View the latest release

Contains value of engineering construction work done, commenced and yet to be done

Reference period
March 2023
Released
28/06/2023

Key statistics

In the March quarter:

  • Seasonally adjusted work done rose 5.6%.
  • Seasonally adjusted work done for the private sector rose 4.6%.
  • Value of work commenced rose 11.6% in original terms.
  • Trend work done rose 3.7%

Value of work done

 Mar Qtr 23

Dec Qtr 22 to
Mar Qtr 23

Mar Qtr 22 to
Mar Qtr 23
$m% change% change

Chain volume measures, seasonally adjusted estimate (a)

Value of work done   
 For the private sector14,787.34.613.2
 For the public sector (b)12,405.36.818.3
 Total engineering construction27,192.65.615.5

a. Reference year for chain volume measures is 2020-21.

b. Includes work done by the private sector for the public sector and work done by the public sector.

 Mar Qtr 23

Dec Qtr 22 to
Mar Qtr 23

Mar Qtr 22 to
Mar Qtr 23
$m% change% change

Chain volume measures, trend estimate (a)

Value of work done   
 For the private sector14,694.63.111.4
 For the public sector (b)12,198.34.216.1
 Total engineering construction26,931.53.713.6

a. Reference year for chain volume measures is 2020-21.

b. Includes work done by the private sector for the public sector and work done by the public sector.

a. Reference year for chain volume measures is 2020-21.

a. Reference year for chain volume measures is 2020-21.

Value of work done, chain volume measures

Total

The seasonally adjusted estimate for the value of total engineering construction work done rose 5.6% in the March quarter to $27,192.6m. The trend estimate rose 3.7%. 

Private Sector

The seasonally adjusted estimate for the value of work done for the private sector rose 4.6% in the March quarter to $14,787.3m. The trend estimate rose 3.1%.

Public Sector

The seasonally adjusted estimate for the value of work done for the public sector rose 6.8% in the March quarter to $12,405.3m. The trend estimate rose 4.2%.

Value of work commenced

Total 

The value of work commenced rose 11.6% in the March quarter to $33,429.2m in original terms.

Private Sector

The value of work commenced for the private sector in the March quarter was $16,449.6m in original terms.

Public Sector

The value of work commenced for the public sector in the March quarter was $16,979.5m in original terms.

Data downloads

Time series spreadsheets

Data files
Data files

About this release

This publication updates the preliminary estimates released in Construction Work Done, Australia on 31 May 2023. This release includes revisions to Engineering Construction data back to September 2019.

Data notes

Several time series spreadsheets for recent quarters contain 'np' (not available for publication) annotations. This is due to confidential data being contained in these series.  

Mining projects tend to be complex in structure and comprise a number of different investment activities including exploration, engineering construction, plant and equipment and buildings. A feature article released in the March 2012 issue of Private New Capital Expenditure and Expected Expenditure, Australia provides a summary of the conceptual basis of the relevant ABS publications that measure investment in Australia, using a hypothetical mining project to illustrate how this investment is reflected in ABS data.

Enquiries

For enquiries about these and related statistics, contact the Customer Assistance Service via the ABS website Contact Us page. The ABS Privacy Policy outlines how the ABS will handle any personal information that you provide to us.

Article archive

Previous catalogue number

This release previously used catalogue number 8762.0

Back to top of the page