ENGINEERING CONSTRUCTION ACTIVITY
For Victoria, the total value (at current prices) of engineering construction activity (work) done during December quarter 2009 was $2,449.3 million, an increase of 6.8% from September quarter 2009 and 17.6% over December quarter 2008. Work done for Water storage and supply, sewerage and drainage made up more than one quarter (25.1%) of the total value, while Electricity generation, transmission etc. and pipelines made up 18.8% and Heavy industry 16.8%.
Value of engineering construction work done, Current prices, Victoria
View underlying table as an Excel spreadsheet: Download
Engineering construction activity, By Type - Victoria: Original from the
Downloads Page.