SEPTEMBER KEY FIGURES
| | Sep qtr 09 | Jun qtr 09 to Sep qtr 09 | Sep qtr 08 to Sep qtr 09 |
| | $m | % change | % change |
TREND ESTIMATES(a) |
|
Value of work done | | | |
| For the private sector | 12 750.3 | 2.7 | 15.6 |
| For the public sector(b) | 7 988.6 | 5.9 | 23.8 |
| Total engineering construction | 20 769.6 | 4.0 | 18.8 |
SEASONALLY ADJUSTED ESTIMATES(a) |
|
Value of work done | | | |
| For the private sector | 12 620.3 | -3.2 | 13.6 |
| For the public sector(b) | 8 324.7 | 13.2 | 27.4 |
| Total engineering construction | 20 945.0 | 2.7 | 18.7 |
|
(a) Chain volume measures, reference year 2007-08. |
(b) Includes work done by the private sector for the public sector and work done by the public sector. |
Value of work done, Chain volume measures
| Value of work done, Chain volume measures - Trend estimates
|
SEPTEMBER KEY POINTS
VALUE OF WORK DONE, CHAIN VOLUME MEASURES
TOTAL
- The trend estimate for the value of total engineering construction work done rose by 4.0% in the September 2009 quarter.
- The seasonally adjusted estimate for the value of total engineering construction work done rose 2.7%, to $20,945.0m, in the September quarter.
PRIVATE SECTOR
- The trend estimate for the value of work done for the private sector rose by 2.7% in the September quarter.
- The seasonally adjusted estimate for the value of work done for the private sector fell 3.2% in the September quarter to $12,620.3m.
PUBLIC SECTOR
- The trend estimate for the value of work done for the public sector rose by 5.9% in the September quarter.
- The seasonally adjusted estimate for the value of work done for the public sector increased by 13.2%, to $8,324.7m, in the September quarter.
VALUE OF WORK COMMENCED
- The value of work commenced in the September quarter was $16,607.8m, a fall of 11.8% from the June 2009 quarter.
NOTES
FORTHCOMING ISSUES
ISSUE (QUARTER) | Release Date |
December 2009 | 8 April 2010 |
March 2010 | 1 July 2010 |
ABOUT THIS ISSUE
This publication updates the preliminary estimates released in
Construction Work Done, Australia (cat. no. 8755.0) on 25 November 2009.
CHANGES IN THIS ISSUE
A new base year, 2007-08, has been introduced into the chain volume estimates which has resulted in revisions to growth rates in subsequent periods. In addition, the chain volume estimates have been re-referenced to 2007-08, thereby preserving additivity in the quarters after the reference year. Re-referencing affects the levels of, but not the movements in, chain volume estimates.
SIGNIFICANT REVISIONS THIS QUARTER
Compared with the current price estimates in original terms published in the previous issue of this publication:
- The June quarter work done estimates have been revised downwards by $164.3m. These revisions occurred predominantly in 'Sewerage and Drainage'.
INQUIRIES
For further information about these and related statistics, contact the National Information and Referral Service on 1300 135 070 or Willie Hynd on Adelaide (08) 8237 7646.