DECEMBER KEY FIGURES
| | Dec qtr 09 | Sep qtr 09 to Dec qtr 09 | Dec qtr 08 to Dec qtr 09 |
| | $m | % change | % change |
TREND ESTIMATES(a) |
|
Value of work done | | | |
| For the private sector | 12 485.8 | 0.2 | 7.3 |
| For the public sector(b) | 7 995.7 | 2.3 | 18.2 |
| Total engineering construction | 20 502.2 | 1.1 | 11.5 |
SEASONALLY ADJUSTED ESTIMATES(a) |
|
Value of work done | | | |
| For the private sector | 12 152.4 | -2.7 | -0.7 |
| For the public sector(b) | 7 724.1 | -6.1 | 10.9 |
| Total engineering construction | 19 876.4 | -4.1 | 3.5 |
|
(a) Chain volume measures, reference year 2007-08. |
(b) Includes work done by the private sector for the public sector and work done by the public sector. |
Value of work done, Chain volume measures
| Value of work done, Chain volume measures - Trend estimates
|
DECEMBER KEY POINTS
VALUE OF WORK DONE, CHAIN VOLUME MEASURES
TOTAL
- The trend estimate for the value of total engineering construction work done rose by 1.1% in the December 2009 quarter.
- The seasonally adjusted estimate for the value of total engineering construction work done fell 4.1%, to $19,876.4m, in the December quarter.
PRIVATE SECTOR
- The trend estimate for the value of work done for the private sector rose by 0.2% in the December quarter.
- The seasonally adjusted estimate for the value of work done for the private sector fell 2.7% in the December quarter to $12,152.4m.
PUBLIC SECTOR
- The trend estimate for the value of work done for the public sector rose by 2.3% in the December quarter.
- The seasonally adjusted estimate for the value of work done for the public sector fell 6.1%, to $7,724.1m, in the December quarter.
VALUE OF WORK COMMENCED
- The value of work commenced in the December quarter was $59,370.9m, a rise of 259.1% from the September 2009 quarter.
NOTES
FORTHCOMING ISSUES
ISSUE (QUARTER) | Release Date |
March 2010 | 1 July 2010 |
June 2010 | 6 October 2010 |
ABOUT THIS ISSUE
This publication updates the preliminary estimates released in
Construction Work Done, Australia (cat. no. 8755.0) on 25 February 2010.
CHANGES IN THIS ISSUE
There are no changes in this issue.
SIGNIFICANT REVISIONS THIS QUARTER
Compared with the current price estimates in original terms published in the previous issue of this publication:
- The September quarter work done estimates have been revised downward by $158.2m. These revisions occurred predominantly in work for the private sector.