ENGINEERING CONSTRUCTION ACTIVITY
The total value of engineering work done during June quarter 2007 was $1,943.8m, an increase of 12.7% from March quarter 2007. The overall increase in June quarter 2007 was mainly due to increases in the value of work done for Telecommunications ($111.1m), Heavy industry ($65.7m) and Electricity generation, transmission etc. and pipelines ($37.7m).
In contrast, the value of work done on Roads, highways and subdivisions decreased by $14.8m.
View underlying table as an Excel spreadsheet: 8762.0 Table 15, Value Of Work Commenced, By Section, Vic, Original (246kB)
View underlying table as an Excel spreadsheet: 8762.0 Table 16, Value Of Work Done, By Section, Vic, Original (216kB)
View underlying table as an Excel spreadsheet: 8762.0 Table 17, Value Of Work Yet To Be Done, By Section, Vic, Original (200kB)