TECHNICAL NOTE DATA QUALITY
INTRODUCTION
1 Since the estimates in this publication are based on information obtained from occupants of a sample of dwellings, they are subject to sampling variability. That is, they may differ from those estimates that would have been produced if all dwellings had been included in the survey. One measure of the likely difference is given by the standard error (SE), which indicates the extent to which an estimate might have varied by chance because only a sample of dwellings was included. There are about two chances in three (67%) that a sample estimate will differ by less than one SE from the number that would have been obtained if all dwellings had been included, and about 19 chances in 20 (95%) that the difference will be less than two SEs. Another measure of the likely difference is the relative standard error (RSE), which is obtained by expressing the SE as a percentage of the estimate.
2 Due to space limitations, it is impractical to print the SE of each estimate in the publication. Instead, a table of SEs is provided to enable readers to determine the SE for an estimate from the size of that estimate (see table T1). The SE table is derived from a mathematical model, referred to as the 'SE model', which is created using data from a number of past Labour Force Surveys. It should be noted that the SE model only gives an approximate value for the SE for any particular estimate, since there is some minor variation between SEs for different estimates of the same size.
3 Due to sample reduction/reinstatement, the sample size of the Labour Force Survey (LFS) and supplementary surveys has varied from July 2008. Detailed information about the sample reduction/re-instatement is provided in Information Paper: Labour Force Survey Sample Design, Nov 2007 (Third edition) (cat. no. 6269.0).
CALCULATION OF STANDARD ERROR
4 An example of the calculation and the use of SEs in relation to estimates of persons is as follows. Table 1 shows that the estimated number of people in Australia who were discouraged job seekers was 102,100. Since the estimate is between 100,000 and 150,000, table T1 shows that the SE for Australia will lie between 5,100 and 6,050 and can be approximated by interpolation using the following general formula:
5 Therefore, there are about two chances in three that the value that would have been produced if all dwellings had been included in the survey will fall within the range 97,000 to 107,200 and about 19 chances in 20 that the value will fall within the range 91,900 to 112,300. This example is illustrated in the following diagram.
6 In general, the size of the SE increases as the size of the estimate increases. Conversely, the RSE decreases as the size of the estimate increases. Very small estimates are thus subject to such high RSEs that their value for most practical purposes is unreliable. In the tables in this publication, only estimates with RSEs of 25% or less are considered reliable for most purposes. Estimates with RSEs greater than 25% but less than or equal to 50% are preceded by an asterisk (e.g.*3.2) to indicate they are subject to high SEs and should be used with caution. Estimates with RSEs of greater than 50%, preceded by a double asterisk (e.g.**0.4), are considered too unreliable for general use and should only be used to aggregate with other estimates to provide derived estimates with RSEs of less than 25%.
PROPORTIONS AND PERCENTAGES
7 Proportions and percentages formed from the ratio of two estimates are also subject to sampling errors. The size of the error depends on the accuracy of both the numerator and the denominator. A formula to approximate the RSE of a proportion is given below. This formula is only valid when x is a subset of y.
8 Considering the example above, of the 102,100 people who were discouraged job seekers, 62,300 or 61.0% were females. The SE of 62,300 may be calculated by interpolation as 4,200. To convert this to an RSE we express the SE as a percentage of the estimate, or 4,200/62,300=6.7%. The SE for 102,100 was calculated previously as 5,100 which converted to an RSE is 5,100/102,100=5.0%. Applying the above formula, the RSE of the proportion is:
9 Therefore, the SE for the proportion of discouraged job seekers who were females is 2.7 percentage points (=(61.0/100)x4.5). Therefore, there are about two chances in three that the proportion of females who were discouraged job seekers was between 58.3% and 63.7% and 19 chances in 20 that the proportion is within the range 55.6% to 66.4%.
DIFFERENCES
10 Published estimates may also be used to calculate the difference between two survey estimates (of numbers or percentages). Such an estimate is subject to sampling error. The sampling error of the difference between two estimates depends on their SEs and the relationship (correlation) between them. An approximate SE of the difference between two estimates (x-y) may be calculated by the following formula:
11 While this formula will only be exact for differences between separate and uncorrelated characteristics or subpopulations, it is expected to provide a good approximation for all differences likely to be of interest in this publication.
STANDARD ERRORS
T1 STANDARD ERRORS OF ESTIMATES |
|
| | | | | | | | | AUST. |
| NSW | Vic. | Qld | SA | WA | Tas. | NT | ACT | SE | RSE |
Size of estimate (persons) | no. | no. | no. | no. | no. | no. | no. | no. | no. | no. |
|
100 | 160 | 170 | 150 | 150 | 160 | 110 | 100 | 90 | 110 | 110.0 |
200 | 270 | 270 | 240 | 220 | 240 | 160 | 140 | 160 | 200 | 100.0 |
300 | 350 | 340 | 310 | 280 | 310 | 200 | 170 | 200 | 270 | 90.0 |
500 | 470 | 460 | 430 | 360 | 410 | 250 | 210 | 270 | 390 | 78.0 |
700 | 580 | 560 | 520 | 420 | 490 | 290 | 250 | 320 | 490 | 70.0 |
1,000 | 710 | 680 | 640 | 490 | 580 | 340 | 290 | 370 | 620 | 62.0 |
1,500 | 880 | 830 | 800 | 590 | 700 | 400 | 360 | 430 | 790 | 52.7 |
2,000 | 1 030 | 960 | 930 | 670 | 800 | 440 | 420 | 470 | 930 | 46.5 |
2,500 | 1 150 | 1 050 | 1 050 | 750 | 900 | 500 | 450 | 500 | 1 050 | 42.0 |
3,000 | 1 250 | 1 150 | 1 150 | 800 | 950 | 500 | 500 | 500 | 1 150 | 38.3 |
3,500 | 1 350 | 1 250 | 1 200 | 850 | 1 000 | 550 | 550 | 550 | 1 250 | 35.7 |
4,000 | 1 450 | 1 350 | 1 300 | 900 | 1 050 | 550 | 600 | 550 | 1 350 | 33.8 |
5,000 | 1 600 | 1 450 | 1 400 | 1 000 | 1 150 | 600 | 700 | 650 | 1 550 | 31.0 |
7,000 | 1 850 | 1 700 | 1 650 | 1 100 | 1 350 | 700 | 900 | 750 | 1 800 | 25.7 |
10,000 | 2 150 | 1 950 | 1 900 | 1 250 | 1 500 | 850 | 1 250 | 950 | 2 100 | 21.0 |
15,000 | 2 500 | 2 300 | 2 200 | 1 500 | 1 750 | 1 050 | 1 750 | 1 250 | 2 500 | 16.7 |
20,000 | 2 800 | 2 550 | 2 400 | 1 700 | 2 000 | 1 250 | 2 200 | 1 500 | 2 800 | 14.0 |
30,000 | 3 200 | 2 900 | 2 750 | 2 100 | 2 500 | 1 550 | 3 050 | 1 850 | 3 250 | 10.8 |
40,000 | 3 550 | 3 200 | 3 150 | 2 450 | 3 000 | 1 750 | 3 750 | 2 050 | 3 550 | 8.9 |
50,000 | 3 850 | 3 550 | 3 500 | 2 750 | 3 400 | 2 000 | 4 400 | 2 200 | 3 850 | 7.7 |
100,000 | 5 400 | 5 100 | 5 100 | 3 900 | 5 000 | 2 700 | 6 800 | 2 500 | 5 100 | 5.1 |
150,000 | 6 850 | 6 550 | 6 450 | 4 700 | 6 150 | 3 250 | 8 600 | 2 500 | 6 050 | 4.0 |
200,000 | 8 200 | 7 800 | 7 600 | 5 350 | 7 050 | 3 650 | . . | . . | 6 950 | 3.5 |
300,000 | 10 350 | 9 900 | 9 300 | 6 300 | 8 500 | 4 250 | . . | . . | 8 450 | 2.8 |
500,000 | 13 350 | 13 300 | 11 800 | 7 550 | 10 500 | 5 050 | . . | . . | 11 050 | 2.2 |
1,000,000 | 17 850 | 19 600 | 15 450 | 9 400 | 13 600 | . . | . . | . . | 16 350 | 1.6 |
2,000,000 | 22 250 | 28 350 | 19 200 | 11 200 | 16 950 | . . | . . | . . | 23 700 | 1.2 |
5,000,000 | 26 700 | 45 150 | 23 500 | . . | . . | . . | . . | . . | 34 200 | 0.7 |
10,000,000 | 28 300 | 63 050 | . . | . . | . . | . . | . . | . . | 41 050 | 0.4 |
15,000,000 | . . | . . | . . | . . | . . | . . | . . | . . | 44 050 | 0.3 |
|
. . not applicable |
T2 LEVELS AT WHICH ESTIMATES HAVE RELATIVE STANDARD ERRORS OF 25% AND 50%(a) |
|
| NSW | Vic. | Qld. | SA | WA | Tas. | NT | ACT | Australia |
Percentage | no. | no. | no. | no. | no. | no. | no. | no. | no. |
|
RSE of 25% | 7 700 | 6 600 | 6 300 | 3 300 | 4 500 | 1 700 | 1 400 | 1 800 | 7 300 |
RSE of 50% | 2 100 | 1 800 | 1 700 | 1 000 | 1 300 | 500 | 400 | 600 | 1 700 |
|
(a) Refers to the number of people contributing to the estimate. |