5625.0 - Private New Capital Expenditure and Expected Expenditure, Australia, Sep 2016
Quality Declaration

ARCHIVED ISSUE Released at 11:30 AM (CANBERRA TIME) 01/12/2016
Page tools:
![]() ![]() | ||
|
ACTUAL AND EXPECTED NEW CAPITAL EXPENDITURE TOTAL CAPITAL EXPENDITURE Estimate 4 for total capital expenditure for 2016-17 is $106,926m. This is 14.3% lower than Estimate 4 for 2015-16. The main contributor to the decrease is Mining (-33.6%). Estimate 4 is 1.3% higher than Estimate 3 for 2016-17. The main contributor to the increase was Other Selected Industries (4.7%). BUILDINGS AND STRUCTURES Estimate 4 for buildings and structures for 2016-17 is $64,041m. This is 21.4% lower than Estimate 4 for 2015-16. The main contributor to the decrease was Mining (-36.7%). Estimate 4 is 0.6% lower than Estimate 3 for 2016-17. The main contributor to the decrease was Mining (-4.0%). EQUIPMENT, PLANT AND MACHINERY Estimate 4 for equipment, plant and machinery for 2016-17 is $42,884m. This is 0.8% lower than Estimate 4 for 2015-16. The main contributor to this decrease is Mining (-10.8%). Estimate 4 is 4.2% higher than Estimate 3 for 2016-17. The main contributor to the increase is Other Selected Industries (5.0%). MINING Estimate 4 for Mining for 2016-17 is $39,896m. This is 33.6% lower than Estimate 4 for 2015-16. Estimate 4 is 3.2% lower than Estimate 3 for 2016-17. Buildings and structures is 4.0% lower and equipment, plant and machinery is 1.1% higher than the corresponding third estimate for 2016-17. MANUFACTURING Estimate 4 for Manufacturing for 2016-17 is $8,504m. This is 3.7% higher than Estimate 4 for 2015-16. Estimate 4 is 0.1% higher than Estimate 3 for 2016-17. Equipment, plant and machinery is 3.2% higher and buildings and structures is 8.7% lower than the corresponding third estimate for 2016-17. OTHER SELECTED INDUSTRIES Estimate 4 for Other Selected Industries for 2016-17 is $58,526m. This is 3.7% higher than Estimate 4 for 2015-16. Estimate 4 is 4.7% higher than Estimate 3 for 2016-17. Equipment, plant and machinery is 5.0% higher and buildings and structures is 4.5% higher than the corresponding third estimate for 2016-17. Document Selection These documents will be presented in a new window.
|