8301.0 - Production of Selected Construction Materials, Nov 2012
ARCHIVED ISSUE Released at 11:30 AM (CANBERRA TIME) 21/12/2012
Page tools:
![]() ![]() | ||
|
This document was added or updated on 09/01/2013. 09/01/2013 In the November release the Explanatory Notes refer to a change in the series level due to coverage changes as a result of ASGS implementation. Point 5 states that this change was approximately 3.5%. This number should have been 5.5%. No other figures have been changed.
Document Selection These documents will be presented in a new window.
|